Construction & Engineering

Enterprise Operating Platform for Ethiopian Building Management & Real Estate

Standardized SmartERP solution tailored for Ethiopian Building Management & Real Estate operations with MOR compliance.

Apex Horizon Commercial Facilities PLC 2 Active Roles 100% GAAP Balanced

Role-Based Executive & Operational Workspaces

Executive Leadership
Facilities CEO / Asset Director

...

Portfolio CockpitOccupancy AnalyticsYields
Launch Workspace
Facility Management
Facilities & Property General Manager

...

Building OperationsTenant OnboardingSLA
Launch Workspace
Tenant Leasing
Commercial Leasing Officer

...

Leasing PipelineVacant DirectoryLeases
Launch Workspace
Engineering Systems
Chief Facilities MEP Engineer

...

MEP SystemsSub-MetersMaintenance Schedules
Launch Workspace
Field Maintenance
MEP Maintenance Field Technician

...

Work OrdersSpare PartsField Checklists
Launch Workspace
Financial Control
Finance Controller & Tenant Billing

...

Rent InvoicingUtility BillingCollections
Launch Workspace

End-to-End Operational Workflows

Workflow BMS-01: Construction Handover to Facility Operations & Asset Commissioning
wf_bms_handover
4 Steps

Bridge construction completion with live operations: audit contractor as-builts, register equipment assets, configure preventive maintenance routines, and sign off occupancy readiness.

  • 1Construction Project Handover Audit: Audit contractor as-built drawings, O&M manuals, and municipal occupancy certificates. (Certified Handover Dossier)
  • 2MEP Equipment Asset Registration: Catalogue HVAC chillers, backup generators, and elevator banks with asset tags and serials. (Master Equipment Asset Register)
  • 3Preventive Maintenance Scheduling: Configure automated maintenance routines for HVAC (quarterly) and generators (monthly). (Active Maintenance Schedules)
  • 4Tenant Occupancy Readiness Sign-Off: Conduct safety audit, zero utility sub-meters, and issue operational readiness certificate. (Operational Readiness Certificate)
Workflow BMS-02: Tenant Maintenance Service Request to Work Order Closure
wf_bms_service
4 Steps

Manage tenant service delivery: ticket capture, SLA prioritization, technician dispatch, spare parts withdrawal, repair execution, and transparent CAM cost allocation.

  • 1Tenant Service Request & SLA Classification: Log service ticket, assign Category A priority (2-hr response SLA), and alert engineer. (Service Request Ticket)
  • 2Field Work Order & Parts Requisition: Dispatch technician with digital checklist and spare thermostat unit from site stores. (Dispatched Work Order & Parts Slip)
  • 3Diagnostic Repair & Calibration: Inspect air handling unit, replace actuator valve, and log calibrated temperature readings. (Work Completion Checklist)
  • 4Tenant SLA Sign-Off & CAM Cost Allocation: Customer signs completion voucher; allocate repair costs to common area maintenance ledger. (Executed Work Order & CAM Ledger)

Sector Pain Points & SmartERP Solutions

Industry Challenges Solved
Fragmented Departmental Data

Siloed legacy software creates delays and reconciliation bottlenecks.

Regulatory & Tax Compliance

Keeping up with Ethiopian MOR electronic tax and POESSA pension filing.

Standardized SmartERP Architecture
Unified Single Source of Truth

Real-time ledger updates tie sales, purchasing, and operations together.

Built-in Ethiopian Statutory Compliance

Automated 15% VAT calculation, withholding tax, and POESSA pension schedules.

Included Industry Applications & Localization

Core Financial Ledger

100% Ethiopian GAAP & MOR Statutory Reporting.

Operations & Inventory

Real-time stock valuation and material movements.

Payroll & HR

POESSA statutory pension and employee tax calculation.